![Lucent Technologies J85501D-2 Product Manual Download Page 36](http://html.mh-extra.com/html/lucent-technologies/j85501d-2/j85501d-2_product-manual_1946208036.webp)
Lucent Technologies Lineage
®
2000 ECS-12 Controller J85501D-2
Issue 3 August 1998
Installation and Setup 4 - 1
4
Installation and Setup
Introduction
This section covers the installation and setup procedures for all
configurations of the ECS-12 controller. Follow all the
applicable steps in the following sections, in the order they are
presented.
Tools Required
The tools required in this section are the following.
•
Flat-blade screwdriver (for shipped-loose mounting only)
•
Cutters (for wire and for plastic wire ties)
•
Jeweler's screwdriver (for alarm wiring)
•
Wire strippers (22 to 26-gauge)
Shipped-Loose
Unit
Installation
Controllers are typically factory wired and assembled to a
battery plant bay. For custom engineered applications or as a
replacement, however, the ECS-12 controller may be shipped as
a loose unit. The user must assemble and wire a shipped-loose
unit to the plant.
The LVD/Fuse Board (CP5) must be mounted in the bay to
provide fused power for the controller. Hardware setup for the
LVD/Fuse Board is included in this section, but mounting details
are not provided here. Refer to the battery plant product manual
or separate kit installation instruction sheet for kit installation.
If the ECS-12 controller is received factory assembled as part of
a Lineage
®
2000 Battery Plant, skip to “Hardware Setup.”
Preparation
On delivery, immediately inspect the shipping carton for
damage. If the crate is damaged, unpack and inspect for damage