IXL-001
: Operation and Maintenance
365-575-102
Page 14 of 14
Issue 8.0, July 2002
FT-2000 M
ULTIPLEXER
DLP-529
Introduction to the PC
DLP-530
Test Miscellaneous Discrete Telemetry
DLP-531
Provision STS-1 Path Trace
DLP-532
Verify STS-1 Path Trace
DLP-533
Install/Remove Apparatus (Circuit Pack) Blank
DLP-534
Verify That Low-Speed Ports Are Not NMON
DLP-535
Identify Source of Incoming Signal
DLP-536
Enter/Delete/Edit STS-3 (or STS-1) Cross-Connections at Network
Elements for 2-Fiber Ring Network
DLP-537
Enter/Delete/Edit Limited Granularity STS-1 Cross-Connections in
Network Elements for 2-Fiber Ring Network (for Rel. 6 and Earlier)
DLP-538
Loop Back OC-3 Line(s) for Testing
DLP-539
Release Looped Back OC-3 Line(s)
DLP-540
Provision OC3 Slot for 1-Way Drop Service
DLP-541
Test DRI Cross-Connections for Path Integrity in FT-2000 Ring
DLP-542
Enter/Delete DCC Assignment on OC-3/OC-12 Line
DLP-543
STS3 (or STS1) Path Trace Monitor for Non-DS3 Signals
DLP-544
Enter or Change TID String of FT-2000 Network Element
DLP-545
Replace Fan Filter Every Six Months (in D-Bay)
DLP-546
Replace Defective Fan Unit in D-Bay
DLP-547
Provision OC12 Slot for 1-Way Drop Service
DLP-548
Release Looped Back OC-12 Line(s)
DLP-549
Loop Back OC-12 Line(s) for Testing
DLP-550
Replace a Defective Power-Line Filter
DLP-551
Power Down/Power Up an Optical Network Element
*
Table A is provided as a reference only and should not be used alone in finding instructions for
performing tasks.
Table A – Numerical List of TOP Procedures (Note)
*
(Contd)
Summary of Contents for FT-2000 OC-48
Page 4: ......
Page 6: ......
Page 30: ...Tables xxx Issue 8 0 July 2002 ...
Page 58: ...1 ii Issue 8 0 July 2002 Table of Contents ...
Page 66: ...System Introduction 1 8 Issue 8 0 July 2002 ...
Page 68: ...2 ii Issue 8 0 July 2002 Table of Contents Synchronization Messaging 2 48 ...
Page 118: ...Applications 2 50 Issue 8 0 July 2002 ...
Page 186: ...4 ii Issue 8 0 July 2002 Table of Contents ...
Page 194: ...Power 4 8 Issue 8 0 July 2002 ...
Page 240: ...Control Transmission and Synchronization Interfaces 5 44 Issue 8 0 July 2002 ...
Page 242: ...6 ii Issue 8 0 July 2002 Table of Contents ...
Page 274: ...Operations Interfaces 6 32 Issue 8 0 July 2002 ...
Page 402: ...Circuit Pack Descriptions 7 124 Issue 8 0 July 2002 ...
Page 648: ...Maintenance Description 9 96 Issue 8 0 July 2002 ...
Page 704: ...Technical Specifications 10 52 Issue 8 0 July 2002 ...
Page 708: ...11 iv Issue 8 0 July 2002 Table of Contents ...
Page 865: ...Craft Interface Terminal Usage Issue 8 0 July 2002 11 157 12 Press ENTER ...
Page 909: ...Glossary Issue 8 0 July 2002 GL 23 ...
Page 910: ...Glossary GL 24 Issue 8 0 July 2002 ...
Page 914: ......
Page 916: ......
Page 944: ...NTP 002 Acceptance 365 575 102 Page 4 of 4 Issue 8 0 July 2002 ...
Page 948: ...NTP 003 Acceptance 365 575 102 Page 4 of 4 Issue 8 0 July 2002 ...
Page 952: ...NTP 004 Acceptance 365 575 102 Page 4 of 4 Issue 8 0 July 2002 ...
Page 960: ...NTP 006 Acceptance 365 575 102 Page 6 of 6 Issue 8 0 July 2002 ...
Page 984: ...NTP 011 Acceptance 365 575 102 Page 4 of 4 Issue 8 0 July 2002 ...
Page 990: ...NTP 002 Circuit Order 365 575 102 Page 4 of 4 Issue 8 0 July 2002 ...
Page 994: ...NTP 003 Circuit Order 365 575 102 Page 4 of 4 Issue 8 0 July 2002 ...
Page 1032: ...NTP 010 Circuit Order 365 575 102 Page 6 of 6 Issue 8 0 July 2002 ...
Page 1042: ...NTP 012 Circuit Order 365 575 102 Page 6 of 6 Issue 8 0 July 2002 ...
Page 1052: ...NTP 014 Circuit Order 365 575 102 Page 6 of 6 Issue 8 0 July 2002 ...
Page 1064: ...NTP 016 Circuit Order 365 575 102 Page 6 of 6 Issue 8 0 July 2002 ...
Page 1070: ...NTP 017 Circuit Order 365 575 102 Page 6 of 6 Issue 8 0 July 2002 ...
Page 1074: ...NTP 018 Circuit Order 365 575 102 Page 4 of 4 Issue 8 0 July 2002 ...
Page 1092: ...NTP 004 Operation 365 575 102 Page 6 of 6 Issue 8 0 July 2002 ...
Page 1104: ...NTP 007 Operation 365 575 102 Page 6 of 6 Issue 8 0 July 2002 ...
Page 1122: ...NTP 009 Operation 365 575 102 Page 16 of 16 Issue 8 0 July 2002 ...
Page 1138: ...Operations NTP 012 365 575 102 Page 4 of 4 Issue 8 0 July 2002 ...
Page 1146: ...TAD 100 Trouble Clearing 365 575 102 Page 4 of 4 Issue 8 0 July 2002 ...
Page 1166: ...TAP 106 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1168: ...TAP 107 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1172: ...TAP 109 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1184: ...TAP 112 Trouble Clearing 365 575 102 Page 4 of 4 Issue 8 0 July 2002 ...
Page 1188: ...TAP 113 Trouble Clearing 365 575 102 Page 4 of 4 Issue 8 0 July 2002 ...
Page 1192: ...TAP 114 Trouble Clearing 365 575 102 Page 4 of 4 Issue 8 0 July 2002 ...
Page 1204: ...TAP 116 Trouble Clearing 365 575 102 Page 4 of 4 Issue 8 0 July 2002 ...
Page 1206: ...TAP 117 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1210: ...TAP 119 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1218: ...TAP 122 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1222: ...TAP 124 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1232: ...TAP 129 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1234: ...TAP 130 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1236: ...TAP 131 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1238: ...TAP 132 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1240: ...TAP 133 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1242: ...TAP 134 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1244: ...TAP 135 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1252: ...TAP 138 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1256: ...TAP 140 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1260: ...TAP 142 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1262: ...TAP 143 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1264: ...TAP 144 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1268: ...TAP 146 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1270: ...TAP 147 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1278: ...TAP 151 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1280: ...TAP 152 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1284: ...TAP 154 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1292: ...TAP 156 Trouble Clearing 365 575 102 Page 4 of 4 Issue 8 0 July 2002 ...
Page 1294: ...TAP 157 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1298: ...TAP 159 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1300: ...TAP 160 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1306: ...TAP 163 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1308: ...TAP 164 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1312: ...TAP 166 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1316: ...TAP 168 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1318: ...TAP 169 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1326: ...TAP 173 Trouble Clearing 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1334: ...TAP 174 Trouble Clearing 365 575 102 Page 8 of 8 Issue 8 0 July 2002 ...
Page 1342: ...DLP 500 Detailed Level Procedure 365 575 102 Page 4 of 4 Issue 8 0 July 2002 ...
Page 1360: ...DLP 504 Detailed Level Procedure 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1362: ...DLP 505 Detailed Level Procedure 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1368: ...DLP 506 Detailed Level Procedure 365 575 102 Page 6 of 6 Issue 8 0 July 2002 ...
Page 1372: ...DLP 508 Detailed Level Procedure 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1392: ...DLP 512 Detailed Level Procedure 365 575 102 Page 14 of 14 Issue 8 0 July 2002 ...
Page 1394: ...DLP 513 Detailed Level Procedure 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1400: ...DLP 515 Detailed Level Procedure 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1402: ...DLP 516 Detailed Level Procedure 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1406: ...DLP 518 Detailed Level Procedure 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1412: ...DLP 519 Detailed Level Procedure 365 575 102 Page 6 of 6 Issue 8 0 July 2002 ...
Page 1414: ...DLP 520 Detailed Level Procedure 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1428: ...DLP 522 Detailed Level Procedure 365 575 102 Page 4 of 4 Issue 8 0 July 2002 ...
Page 1430: ...DLP 523 Detailed Level Procedure 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1434: ...DLP 524 Detailed Level Procedure 365 575 102 Page 4 of 4 Issue 8 0 July 2002 ...
Page 1440: ...DLP 526 Detailed Level Procedure 365 575 102 Page 4 of 4 Issue 8 0 July 2002 ...
Page 1448: ...DLP 528 Detailed Level Procedure 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1462: ...DLP 532 Detailed Level Procedure 365 575 102 Page 6 of 6 Issue 8 0 July 2002 ...
Page 1466: ...DLP 534 Detailed Level Procedure 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1472: ...DLP 535 Detailed Level Procedure 365 575 102 Page 6 of 6 Issue 8 0 July 2002 ...
Page 1486: ...DLP 538 Detailed Level Procedure 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1488: ...DLP 539 Detailed Level Procedure 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1490: ...DLP 540 Detailed Level Procedure 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1500: ...DLP 544 Detailed Level Procedure 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1502: ...DLP 545 Detailed Level Procedure 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1506: ...DLP 547 Detailed Level Procedure 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1508: ...DLP 548 Detailed Level Procedure 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1510: ...DLP 549 Detailed Level Procedure 365 575 102 Page 2 of 2 Issue 8 0 July 2002 ...
Page 1526: ...DLP 550 Detailed Level Procedure 365 575 102 Page 16 of 16 Issue 8 0 July 2002 ...
Page 1532: ...A ii Issue 8 0 July 2002 Table of Contents ...
Page 1554: ...363 206 200 A SONET Overview A 22 Issue 8 0 July 2002 ...
Page 1577: ...Glossary Issue 8 0 July 2002 GL 23 ...
Page 1578: ...Glossary GL 24 Issue 8 0 July 2002 ...