1. General 

1.1. Applications. 

The air handling units are calculated in compliance with the ERP directive for comfort ventilation. Depending 
on the selected variant, these are used such as offices, schools, nurseries, public spaces, shops, homes, etc. 
 
The air handling units are designed in such a way that the air flows are separated. Also, the air handling 
units are suitable for indoor and outdoor installation with a standard hygienic execution by using a very 
smooth surface with a unique rubber seal. 
 
The HCP air handling units with a standard capacity of 600-16,800m3/h and is a compact ventilation system 
with a thermal efficiency of up to 90%. These units are equipped with fans provided with EC technology 
motors. 
 
The HRW air handling units with a standard capacity of 1,200-28,000m3/h and is a compact ventilation 
system with a thermal efficiency of up to 80% and a latent efficiency up to 80% These units are equipped 
with fans provided with EC technology motors. 
 
The Fairtype air handling units with a standard capacity of 600-16,800m3/h and it is a compact ventilation 
system with a thermal efficiency of up to 90% including an indirect evaporation section for cooling with an 
evaporation efficiency of up to 115%. These units are equipped with fans provided with EC technology 
motors. 

2. Safety instructions  

The installation of the air handling unit must be carried out in accordance with the general and locally 
applicable building, safety and installation regulations of municipality, electricity and water supply company. 
 
Personnel concerned must familiarize themselves with this instruction before starting up this installation. 
Damage to the air handling unit or parts thereof, as a result of improper handling by the end user 
or the installer is not covered by the warranty 
 

 

Warning

 

Only licensed electrician or service personnel trained by Lucam b.v may do changes to the air 
handling unit regarding the electrical installation or connections perform external functions.  

 

2.1 Safety switch / main switch 

There is a main switch on the air handling unit, which is located on the operating side of the unit. The air 
handling unit should usually be started and stopped via the terminal, not with safety switch. 

Always switch off the main switch when carrying out work on the air handling unit, unless otherwise stated 
in the appropriate instruction. 

 

 

Summary of Contents for Fairtype 1200

Page 1: ...am b v Dukaat 19 8305BC Emmeloord 1 Lucam HCP Lucam HRW and Fairtype air handling units with counterflow exchanger and or indirect evaporation cooling or recovery wheel Installation operation and maintenance manual ...

Page 2: ...3 Connecting cabinet parts 7 6 Electrical connection 8 6 1 CE marking 8 7 Operation of the unit 9 7 1 Operation 9 7 2 Ease of use and safety 9 7 3 Manual 9 7 4 Start up of the unit 9 8 Technical specifications 10 9 Alarm list 10 10 Service maintenance 10 10 1 Filters 10 10 2 Heat exchanger 10 10 3 Indirect evaporation section 10 10 4 Inspection doors 10 10 5 Conventional Cooling system 10 11 Warra...

Page 3: ...s a compact ventilation system with a thermal efficiency of up to 90 including an indirect evaporation section for cooling with an evaporation efficiency of up to 115 These units are equipped with fans provided with EC technology motors 2 Safety instructions The installation of the air handling unit must be carried out in accordance with the general and locally applicable building safety and insta...

Page 4: ...e stop button on the terminal Do not open inspection doors until the unit has stopped fans and or air valves are in a standing position If not there may be pressure on the door they may be pushed out 3 Dimensions and weight The weight and dimensions of the respective unit is indicated in the technical data sheets of the air handling unit 4 Transport The air handling unit is supplied plug and play ...

Page 5: ...alled in the end When transporting with a forklift truck or roller blocks make sure that the spoons or rollers are under the frame and not on the bottom panel Warning The buyer is liable for damage that occurs during unloading at the destination Proper lifting equipment must be taken into account when hoisting the unit Warning Use equalizers A to lift the unit This will keep the sides of the unit ...

Page 6: ...rn for the safety of the unit can be described as safely installed inspection doors are fitted with lockable hinges and are locked to prevent unauthorized access to internal components of the unit Also note that the unit is connected correctly and duct technically by means of ducts and or air hoods This is to prevent contact hazard valves or fans 5 1 Condensate drain Pay attention The condensation...

Page 7: ... connected to the correct connections outside air intake exhaust air return air supply air There are marking stickers at the connections for checking To avoid unnecessary noise from the unit it is recommended to install mufflers in the exhaust and supply duct 5 3 Connecting cabinet parts When coupling cabinet parts they must be placed directly opposite each other and by means of the brackets to be...

Page 8: ...hin the European Union EU taken must bear the CE mark With the mandatory CE marking the manufacturer of the product indicates that the product meets the minimum requirements regarding the safety of the product Based on one or more product guidelines the product is provided with CE marking Are there for example there are moving parts on the product and an energy supply is the Machinery Directive ap...

Page 9: ...easily recognizable symbols This controller is used for the commissioning and everyday operation of the air handling unit and in connection with service All system values can be seen while the settings are password protected For detailed information about the controller see https lucam air nl handleiding 7 2 Ease of use and safety All menus and graphics are specially adapted to this specific versi...

Page 10: ...due to the timely replacement or absence of the filters This is possible up to lead to a decrease in capacity and an increase in energy consumption If the heat exchanger is very dirty you must immediately contact the service department of your supplier 10 3 Indirect evaporation section The indirect adiabatic cooling system must be inspected at least once a year The nozzles must be checked for a co...

Page 11: ...talled by a recognized installer Warranty extension is only granted in consultation and recorded in writing If no maintenance has been performed on the installation the warranty becomes void 12 Liability The device is designed and manufactured as a ventilation system with the possibility of temperature change The unit serves to ventilate by taking contaminated air outside the building and supplyin...

Page 12: ...curs in small quantities acrylic silicone sealants sealing of the gaskets in EPDM rubber various screws nuts and blind rivets of steel as well as small amounts of copper and brass Materials in total as service personnel can get in touch with plastic insulated electrical wires various other electrical parts Safety Materials The materials are considered to be absolutely harmless Use The device is an...

Page 13: ...eparated after sorting It should be taken into account that load bearing parts of metal aluminum and or plastic may be outdated and therefore the no longer meet the original static load limit This is due to the constant exposure to the weather and UV rays especially in outdoor installations When the bearing parts of metal and plastic are outdated transport must be done with safe modern lifting equ...

Page 14: ...100 HRW 8800 HRW 11500 HRW 13500 HRW 16500 HRW 20000 HRW 22800 HRW 25000 HRW 30000 HRW 3200 HRW 4100 HRW 5600 HRW 7100 HRW 8800 HRW 11500 HRW 13500 HRW 16500 HRW 20000 HRW 22800 HRW 25000 HRW 30000 HRW HP 3200 HRW HP 4100 HRW HP 5600 HRW HP 7100 HRW HP 8800 HRW HP 13500 HCP F 1200 HCP F 1600 HCP F 2300 HCP F 3500 HCP F 4800 HCP F 1200 HCP F 1600 HCP F 2300 HCP F 3500 HCP F 4800 HRW IHP 3200 HRW IH...

Page 15: ...vent reaching hands arms legs and feet in the danger zones DS EN ISO 61000 6 2 2005 Electromagnetic Compatibility EMC Part 6 2 Generic Standards Immunity for Industrial Environments DS EN ISO 61000 6 3 2007 Electromagnetic Compatibility EMC Part 6 3 General Standards Immunity for Household Commercial and Light Industrial environments DS EN 60204 1 2006 Safety of machinery electrical equipment of m...

Reviews: