background image

installation

best practices pocket guide

Summary of Contents for BlazeMaster

Page 1: ...installation best practices pocket guide ...

Page 2: ...h and install if this is your first time using it you ll be pleasantly surprised at how light and flexible it is and how quickly it can be installed We ve put together this Best Practices Guide to help installers This doesn t replace the manufacturer s installation instructions but is a list of do s and don ts that can be helpful in the field Congratulations on choosing BlazeMaster Fire Sprinkler ...

Page 3: ...ile using solvent Provide ventilation or NIOSH approved respirator if necessary Use proper solvent cement and follow application instructions Store between 40 110 F 4 43 C or as specified on label Do not store near heat sparks open flames or other sources of ignition Keep containers closed and covered Do not smoke eat or drink while using Keep solvent cement away from skin eyes and clothing Do not...

Page 4: ...efore use Cutting and Joining Cut pipe squarely using ratchet cutter wheel type plastic tubing cutter power saw or fine tooth saw Deburr inside bevel outside of pipe Test fit the pipe First apply cement to outside of pipe Apply cement without dipping back into the can to inside of fitting socket On sizes 1 32mm and larger dip cement and apply to pipe again Insert pipe end into socket while rotatin...

Page 5: ...nkler head adapter has been solvent welded Make sure the waterway is not obstructed Then install the sprinkler head Allow for movement due to expansion and contraction particularly if installing in cold weather Using Ratchet Cutters Use ratchet cutters only at 50 F 10 C or higher Make sure blades are sharp 5 ...

Page 6: ... 32 hrs 10 days 2 50 mm 8 hrs 48 hrs Note 1 2 3 65 80 mm 24 hrs 96 hrs Note 1 200 psi 1379 kPa Test Pressure maximum Ambient Temperature During Cure Period PIPE SIZE 60 F to 120 F 16 C to 49 C 40 F to 59 4 C to 15 C 0 F to 39 F 18 C to 4 C 20 mm 45 mins 1 hrs 24 hrs 1 25 mm 45 mins 1 hrs 24 hrs 1 1 32 40 mm 1 hrs 16 hrs 120 hrs 2 50 mm 6 hrs 36 hrs Note 1 2 3 65 80 mm 8 hrs 72 hrs Note 1 TABLE 1 T...

Page 7: ...r system temperature must be raised to a temperature of 40 F 4 5 C or above and allowed to cure per the above recommendations prior to pressure testing Follow manufacturer s instructions on pressure testing Fill lines slowly and bleed the air from the system prior to pressure testing Compatibility Notice CPVC pipe can be damaged by contact with chemicals contained in some construction products suc...

Page 8: ...and should be used only as a suggested starting point Because of the variations in methods conditions and equipment used commercially in processing these materials no warranties or guarantees are made as to the suitability of the products for the applications disclosed Full scale testing and end product performance are the responsibility of the user Lubrizol Advanced Materials Inc shall not be lia...

Reviews: