21
Step 7: Check that the gasket is in the pump side, place the DIN connector, and then
tighten the screw.
Be sure to insert the gasket in the direction shown in the photograph
above. Inserting the gasket in the wrong direction prevents sealing.
3-4 Tubing connection
Connect tubing to the machine to the discharge port
(Rc1/8).
Use tubing good for the pressure 10 MPa or
higher.
Fix the joint with hands and then tighten it 2.5 (two and
a half) to 3 (three) turns with a spanner.
Proper torque for fastening : 7.1 N
・
m
After connection, make sure there is no grease leakage
from the joint.
Make sure to bleed air from the tubing and the pump
after connection.
Refer to "6-1 Bleeding air."