![LU-VE Alfa LU-VE AlfaBlue Junior AG Instruction Manual Download Page 21](http://html1.mh-extra.com/html/lu-ve/alfa-lu-ve-alfablue-junior-ag/alfa-lu-ve-alfablue-junior-ag_instruction-manual_1945302021.webp)
AHE00060EN 2010
21
Alfa LU-VE is a trademark registered and owned by LU-VE Group.
Alfa LU-VE reserves the right to change specifications without prior notification.
6 Operation
6.1 Start-up procedure
The following procedure is to be respected at every system start-up.
• Verify there are no leaks in the refrigerant circuit and connections.
•
Switch on fan power supply.
• Start the fans and verify fan direction.
• After some operating time, verify that current absorbtion does not exceed the value as given in
the technical specifications.
6.2 Shutdown
If the unit requires emptying for maintenance, system shutdown or dismounting, proceed as follows:
•
Stop refrigerant supply and switch off electrical power supply.
•
Make sure neither refrigerant nor power supply can be resumed accidentally or unexpectedly.
• Drain all liquid refrigerant into a suitable vessel.
• Evacuate the coil to remove any remaining refrigerant gas.
Summary of Contents for Alfa LU-VE AlfaBlue Junior AG
Page 24: ...alfa luvegroup com...