(2) Upper link installation and
adjustment
Adjust the upper link
①
depending on the
implements.
Length of the upper link
①
can be adjusted by
turning the grip
②
.
Fasten the lock nut
③
.
Adjusting range : 15.7 ~ 29.5 inch.
▶
Insert the snap-pin
⑤
correctly to prevent the upper link pin
④
from being
detached.
Notice
(3) Adjustment of the lift rod’s
length
Lift rod (RH) can be adjusted by loosening the
lock-nut
②
and turning the body
①
.
②
②
②
②
①
①
①
①
④⑤
④⑤
④⑤
④⑤
③
③
③
③
②
②
②
②
4
4
4
4
- 10
After adjusting, tighten the lock-nut
②
again.
(4) Adjustment of stabilizer’s length
The length of the stabilizer can be adjusted by
turning the handle
②
after removing the fixing-pin
①
.
After adjusting, insert the fixing-pin
①
again.
▶
Adjust the clearance of lateral
shaking of the implement to be
within 20~40mm (0.79~1.57 in).
Notice
①
①
①
①
①
①
①
①
②
②
②
②