Lowell UPS9 Series Manual
Pg. 35
Note:
To install the second string of batteries, repeat the
same procedure on the hold down brackets on the right
side of battery box .
Note:
To install the second string of batteries, repeat the
same procedure on the right side of battery box .
Model No. UPS-XBP-48:
Step 1:
Open the package and place the battery box on a horizontal plane .
Step 2:
Remove the left side of the front panel by pulling it from the lower extremity .
Step 3:
Remove the fixed part of the front panel by removing the 2 screws present .
Step 4:
Remove the metal top cover of the battery box by unscrewing 8 screws on the sides (4 per side), 3 screws on top,
and 4 screws on back .
Step 5:
Once the battery box is opened, remove the hold down brackets on the left side by unscrewing the 2 screws on each
bracket .
Step 6:
Now, it is possible to put all batteries inside the unit by following the drawing below, which indicates wire fastener
positions for correct battery placement .