Lowell UPS9 Series Manual
Pg. 11
Rackmount Installation (with 4-point rail kit):
Step 1:
Mount the 4-point rail kit to the rack . Use the (8) 10-32 screws provided to mount left and right support rails (front and
rear) .
Step 2:
Attach the mounting brackets to the UPS .
CAUTION
—DO NOT use mounting brackets to lift the UPS; brackets are
only to secure it to the rack .
Step 3:
Place UPS on the support rails and secure in place with front screws, allowing the horizontal rails to support the weight
of the UPS .
Tower Installation:
NOTE
: Ensure sufficient space is provided for ventilation (pg . 9, Environment) .
Step 1:
Inter-connect the tower brackets that shipped in the box with the UPS .