Page 9
Lotus Service Notes
Section CK
13. If necessary, release the four bolts and remove the damper lower fixing bracket from the lower wishbone,
and the remaining bolt securing the anti-roll bar drop link bracket.
Anti-Roll Bar
14. At least one of the lower wishbones must be removed before the ARB may be withdrawn.
Release the anti-roll bar drop links from the ARB noting that the link assembly is symmetrical end to end.
Note that the drop link ball pin self locking nuts should be discarded and renewed for re-assembly. Re-
lease the two bolts securing each of the two ARB pivot clamps to the chassis brackets and withdraw the
anti-roll bar.
Reassembly
Re-assemble the suspension in reverse order to disassembly with the following notes:
-
If the car suffers a suspension impact sufficient to damage a wheel rim, careful attention should be paid
to all related suspension components, and replacement parts fitted in any cases of doubt.
-
Smear the shank of each pivot bolt with PBC grease to inhibit corrosion and facilitate subsequent servic-
ing, but do not allow grease contamination of the threads.
-
Where bolts are threaded into captive nuts with no secondary locking mechanism, apply a suitable thread-
locking compound. If separate self-locking nuts are used, assess the locking torque and renew the nuts
in any case of doubt. The ARB drop link ball pin self locking nuts should always be renewed.
-
Take care to match mark and refit the eccentric cam adjusters on the lower wishbone pivots in their original
settings to facilitate subsequent geometry checking and adjustment.
-
Lubricate the rubber type anti-roll bar mountings with rubber grease on assembly.
-
Refit the plastic bung into the steering arm counterbore to prevent corrosion of the ball joint fixing.
-
The damper body is provided with three location grooves for the circlip retaining the spring lower seat.
Use the middle position for standard ride height setting. Use spring compressor clamps to assemble the
spring/damper/top mounting bracket (spring close coils lowermost), before fitting the complete assembly
to the car. Do not omit the spring top seat cushion.
-
Pump the brake pedal to reposition the pads before driving the car.
The Service Schedule specifies that the security of the front and rear suspension is checked at each service.
For cars used on race tracks, or in similar conditions, suspension components and torque checks should be
carried out between sessions. This operation requires that all the principal suspension pivot bolts are torque
checked, noting the following points:
Where a bolt is tapped into a housing or weldnut, and relies on a thread locking compound for security, it
is important to appreciate that if the bolt is disturbed, the locking compound must be re-applied. The following
procedure should be adopted for all such fixings:
-
Check the torque of the fixing.
-
If the specified torque is attained without the fixing being disturbed (moving), take no further action.
-
If the bolt moves, the locking action of the thread adhesive will have been compromised. Remove the
bolt completely, clean off all old adhesive using a wire brush and acetone, and apply new adhesive as
specified.
-
Refit the bolt and tighten to the specified torque.
-
If for any reason a bolt is found to have become loose, and the car has been operated for any period in
this condition, the bolt should be renewed as a standard precaution and related components carefully
inspected for hole ovality, undue stress or wear.
Torque Settings: Nm
Upper and lower wishbone pivot bolts 86
Upper and lower swivel joints to hub carrier 86
Track rod end to steering arm 45
Damper to lower wishbone bracket 135
Damper to top anchor bracket 86
Damper bracket to lower wishbone 45
Spring/damper upper anchor bracket to chassis 45
Hub bearing unit to hub carrier 70 + Permabond A130
Brake calliper to hub carrier 86 + Permabond A130
Anti-roll bar alloy mounting clamps to chassis 45
Summary of Contents for Evora
Page 13: ...Page 7 Lotus Service Notes Section AJ ...
Page 81: ... Lotus Service Notes Section EMR Page 9 EMR 3 COMPONENT LOCATION em239 O2 O2 O2 O2 2009 02 ...
Page 82: ...Page 10 Lotus Service Notes Section EMR em240 2009 02 ...
Page 115: ... Lotus Service Notes Section EMR Page 43 2009 02 ...
Page 116: ...Page 44 Lotus Service Notes Section EMR 2009 02 ...
Page 118: ...Page 46 Lotus Service Notes Section EMR 2009 02 ...
Page 184: ...Page 2 Lotus Service Notes Section JL GENERAL LAYOUT TBA ...
Page 207: ...Page 25 Lotus Service Notes Section JL ...
Page 233: ...Page 9 Lotus Service Notes Section MR Blank page ...
Page 259: ...Page 35 Lotus Service Notes Section MR ...
Page 260: ...Page 36 Lotus Service Notes Section MR ...
Page 261: ...Page 37 Lotus Service Notes Section MR ...
Page 262: ...Page 38 Lotus Service Notes Section MR ...
Page 263: ...Page 39 Lotus Service Notes Section MR ...
Page 264: ...Page 40 Lotus Service Notes Section MR ...
Page 265: ...Page 41 Lotus Service Notes Section MR ...
Page 266: ...Page 42 Lotus Service Notes Section MR ...
Page 267: ...Page 43 Lotus Service Notes Section MR ...
Page 268: ...Page 44 Lotus Service Notes Section MR ...
Page 269: ...Page 45 Lotus Service Notes Section MR ...
Page 270: ...Page 46 Lotus Service Notes Section MR ...
Page 271: ...Page 47 Lotus Service Notes Section MR ...
Page 272: ...Page 48 Lotus Service Notes Section MR ...
Page 273: ...Page 49 Lotus Service Notes Section MR ...
Page 274: ...Page 50 Lotus Service Notes Section MR ...
Page 275: ...Page 51 Lotus Service Notes Section MR ...
Page 276: ...Page 52 Lotus Service Notes Section MR ...
Page 277: ...Page 53 Lotus Service Notes Section MR ...
Page 278: ...Page 54 Lotus Service Notes Section MR ...
Page 279: ...Page 55 Lotus Service Notes Section MR ...
Page 280: ...Page 56 Lotus Service Notes Section MR ...
Page 281: ...Page 57 Lotus Service Notes Section MR ...
Page 282: ...Page 58 Lotus Service Notes Section MR ...
Page 283: ...Page 59 Lotus Service Notes Section MR ...
Page 284: ...Page 60 Lotus Service Notes Section MR ...
Page 285: ...Page 61 Lotus Service Notes Section MR ...
Page 286: ...Page 62 Lotus Service Notes Section MR ...
Page 287: ...Page 63 Lotus Service Notes Section MR ...
Page 288: ...Page 64 Lotus Service Notes Section MR ...
Page 289: ...Page 65 Lotus Service Notes Section MR ...
Page 290: ...Page 66 Lotus Service Notes Section MR ...
Page 291: ...Page 67 Lotus Service Notes Section MR ...
Page 292: ...Page 68 Lotus Service Notes Section MR ...
Page 293: ...Page 69 Lotus Service Notes Section MR ...
Page 294: ...Page 70 Lotus Service Notes Section MR ...
Page 295: ...Page 71 Lotus Service Notes Section MR ...
Page 296: ...Page 72 Lotus Service Notes Section MR ...
Page 297: ...Page 73 Lotus Service Notes Section MR ...
Page 298: ...Page 74 Lotus Service Notes Section MR ...
Page 299: ...Page 75 Lotus Service Notes Section MR ...
Page 300: ...Page 76 Lotus Service Notes Section MR ...
Page 301: ...Page 77 Lotus Service Notes Section MR ...
Page 302: ...Page 78 Lotus Service Notes Section MR ...
Page 303: ...Page 79 Lotus Service Notes Section MR ...
Page 304: ...Page 80 Lotus Service Notes Section MR ...
Page 305: ...Page 81 Lotus Service Notes Section MR ...
Page 306: ...Page 82 Lotus Service Notes Section MR ...
Page 307: ...Page 83 Lotus Service Notes Section MR ...
Page 336: ...Page 2 Lotus Service Notes Section QJ GENERAL LAYOUT Illustration TBA ...
Page 357: ...Page 2 Lotus Service Notes Section WF Illustration to follow ...