8
INSTALLATION
PLEASE
READ
ENTIRE
INSTALLATION
SECTION
BEFORE
STARTING
INSTALLATION. BE SURE THAT ONLY QUALIFIED PERSONNEL SHOULD PERFORM
THIS INSTALLATION.
v
BEFORE INSTALLATION
ELECTRIC SHOCK can kill
w
Turn the input power OFF and unplug the machine from the receptacle before working on this
equipment. Allow machine to sit for 5 minutes minimum to allow the power capacitors to
discharge before working inside this equipment.
w
Insulate yourself from the work and ground.
w
Always wear dry insulating gloves.
w
Always connect the cutting machine to a power supply grounded according to the National
Electrical Code and local codes.
Ø
SELECT SUITABLE LOCATION
The Inverter will operate in harsh environments. Even so, it is important that simple preventative measures are
followed in order to assure long life and reliable operation.
The machine must be located where there is free circulation of clean air such that air movement in the back
and out the front will not be restricted.
Dirt and dust that can be drawn into the machine should be kept to a minimum. Failure to observe these
precautions can result in excessive operating temperatures and nuisance shutdown.
Ø
STACKING
LTP7000 cannot be stacked.
Ø
TILTING
Place the machine directly on a secure, level surface. The machine may topple over if this procedure is not
followed.
Ø
ENVIRONMENTAL AREA
Keep the machine dry. Do not place it on wet ground or in puddles. Avoid rain water. Operating in rain is not
allowed.
Ø
MACHINE GROUNDING AND HIGH FREQUENCY INTERFERENCE PROTECTION
The Capacitor Discharge Circuit used in the high frequency generator, may cause many radio, TV and
electronic equipment interference problems. These problems may be the result of radiated interference.
Proper grounding methods can reduce or eliminate radiated interference.
Radiated interference can develop in the following four ways: