S15
Pre-Installation and Site Preparation Guide
1008236 Rev B
Loring Smart Roast Proprietary – This document is controlled by
Document Control. By printing this document, it will become a “Reference” copy.
Users are responsible for verifying that it is the latest revision available.
Page 21 of 46
Stack Connection Location
The ventilation stacks connect to openings in the wall or roof. An optimal location is directly above
the corresponding stack connections on the roaster.
Refer to the Mechanical Interface Control Documents from Loring for:
• Exact dimensions and locations on the roaster.
• Stack elbow options for routing through existing openings.
Check local building codes for additional stack ventilation requirements.
Assistance with stack design is available through Loring upon request. Loring recommends
engaging with a stack design consultant to create details for complex site configurations.
Cooling
Vent
Stack
(hot air)