4  Operation

4 1 Panel Layout and Instruction

indicator LEDs

display

keys

Figure 8: Keyboard layout

Indicator light/key

Name

Function

[RUN]

running indicator light

GREEN

ON: controller is running

[STOP]

shutdown indicator light

RED

ON: controller is shut down

[FAULT]

fault indicator light

RED

ON: system fault

[NORMAL]

normal indicator light

GREEN

ON: system normal

[WELL DRY/TANK FULL]

well/tank indicator light

RED

ON: float switch or well probe status is abnormal

RUN

run key

starting control for the controller

STOP

stop key

shutdown control for the controller

DATA

data inquiry key

enter or quit from displaying historical data

MODE

mode switch key

switch between different content when viewing data 
switch the digit that is being edited when editing data

 

increment key 
decrement key

increase/decrease the parameter number or its value when 
editing the parameters
change the historical date upward/downward or display the 
content of the historical data in turns when the historical data 
is displayed
increase/decrease the output frequency or display current run-
ning data upward by turns when the data status is displayed 
during running

PROG

programming key

enter or quit from editing the control parameters

ENTER

enter key

confirm the edited content 
confirm and save the edited parameter value

  

+

  

reset key

press the both keys to reset in the protection status

Summary of Contents for PS15k

Page 1: ...x 29 www lorentz de All specifications and information are given with good intent errors are possible and products may be subject to change without notice Pictures may differ from actual products depe...

Page 2: ...4 1 4 Connection 4 1 5 Operation 4 1 6 Others 4 2 Introduction 5 2 1 Solar Pumping System Components 5 2 2 Product Features 5 2 3 Technical Data 5 3 Installation and Wiring 6 3 1 Purchase Inspection...

Page 3: ...rdous material danger of damage to equipment and buildings Safety oriented Operation The safety directions contained in the manual existing national regulations for the prevention of accidents as well...

Page 4: ...ouble check that input power has been disconnected before connecting the device otherwise electrocution or fire can be caused WARNING The earth terminal must be reliably grounded otherwise touching th...

Page 5: ...PV modules connected in series and in parallel absorbs solar irradiation and converts it into electrical energy providing power for the whole system The pump controller controls and adjusts the system...

Page 6: ...of the PV modules 2 pcs 4 Plug for the negative terminal of the PV modules 2 pcs 5 Motor plug 1 pc 6 sensor plug 1 pc Inspection item Inspection method Consistency with ordered product Inspect the ide...

Page 7: ...s CAUTION To ensure proper operation of the system select the wire size according to the following recom mended principle Prompt Float switch 1 controlled by PR15 and float switch 2 controlled by PR16...

Page 8: ...ug four wires yellow green wire M 1 connected to protective ground wire red wire M 2 connected to U phase of the motor yellow wire M 3 connected to V phase of the motor blue wire M 4 connected to W ph...

Page 9: ...ked with two cable ties For a pump that is to be installed in a vertical position clamp it to the pipe just above the pump outlet as shown in the photo Splice the two probe wires using the splice kit...

Page 10: ...ed electrical potentials during operation of the pump system 3 9 2 How to ground The grounding cable must be a copper cable with a cross section of at least 16mm2 For connection with the con troller u...

Page 11: ...tor light RED ON float switch or well probe status is abnormal RUN run key starting control for the controller STOP stop key shutdown control for the controller DATA data inquiry key enter or quit fro...

Page 12: ...er of controller 1 50kW MODE output current of controller 6 0A MODE time 12 30h MODE syncronous rotation speed 500 min 1 MODE controller temperature 37 C MODE water level sensor status normal water le...

Page 13: ...odified day month year selected digit flickers modify the date to be inquired 12th February ENTER confirm date to be inquired year 2008 MODE historical data accumulated generated energy of the day 9 9...

Page 14: ...displayed Display e g initial status non control parameter display PROG enter the parameter modification interface display parameter PR0 PR 0 select the parameter to be viewed and edited display para...

Page 15: ...age from PR3 according to pump model PR5 start up delay 1 to 150 start up delay time after power up or shut down in seconds 30s PR6 year 2 000 to 2 999 year must be set to actual date PR7 month 1 to 1...

Page 16: ...9 0 no well probe sensor deactivated 0 6 well probe normally closed 7 well probe normally open 8 well probe normally open for dual switch mode with well probe 1 9 well probe normally closed for dual...

Page 17: ...your LORENTZ COMPASS sizing for proper data and compare to the factory values given in the parameter setup table Another way to determine correct values is to measure the real open circuit voltage Vo...

Page 18: ...be clearly visible without measuring Set parameter PR11 to value 0 Set parameter PR12 to value 30 00 Press the RUN key to start the pump and observe the water yield from the outlet Press the STOP key...

Page 19: ...sible frequency accord ing to the available power from the PV generator MPP tracking PR11 2 Same behaviour like for PR11 1 but the pump is not starting automatically it has to be started manually by p...

Page 20: ...rt At this time the fault number will appear in the first and second digit of the numeric display The last several digits will display the countdown of the restart when the count down is 0 fault displ...

Page 21: ...as normal again This time depends on the well probe startup latency PR 27 plus the general pump start delay PR 5 abnormal coordination of float switch 1 and 2 The pump will be restarted after the con...

Page 22: ...se use the controller under environment recommended by this manual Inspect and maintain as per the following table Inspect frequency regular Inspection item Inspection content Judgment standard runnin...

Reviews: