LRF-3000P Ultrasonic flowmeter
- 23 -
5.3.5 Confirmation on Installation Quality
On the operation panel, press [Menu]+[4] to enter M04 menu.
M04
Status
*R
Signal
Sound
Time
UP
DN
Q
80.0
80.1
85
W
al
lt
hi
ck
ne
ss
User’s pipe
Lock nut
Ball valve
Note: The following shows the top
view of the horizontal pipe section
Waterproof plug
O
ut
er
di
am
et
er
Ø
D
Schematic Diagram of Z-shape
Installation of Insert-in Transducer
Transducer
Short pipe on the mounting base
Weld the short pipe on the pipe
Pipe drillhole diameter
(mm)
The section must be parallel with the
pipe and the arrow on it must be
identical with the fluid direction
Li
ne
rt
hi
ck
ne
ss
d2
Upstream straight pipe L1
Downstream straight pipe L2
Installation spacing (mm)
Fluid direction
Service position
of transducer
Drillhole diameter (mm)