Installation & Operation Manual
1
Determine water heater location
(continued)
9
ALCOVE INSTALLATION
0"
RIGHT
12"
TOP
18"
FRONT
OPEN
FRONT
14”
REAR
12”
LEFT
1/4” MINIMUM CLEARANCE
AROUND HOT WATER PIPES
1” MINIMUM CLEARANCE
AROUND VENT PIPES
RECOMMENDED SERVICE CLEARANCES:
FRONT
- 30” (762 mm)
TOP
- 24” (610 mm)
LEFT SIDE - 24” (610 mm)
REAR
- 24” (610 mm)
Figure 1-2 Alcove Installation - Minimum Required Clearances
CLOSET INSTALLATION
6"
6"
CLOSED DOOR
13"
TOP
1/4” MINIMUM CLEARANCE
AROUND HOT WATER PIPES
1” MINIMUM CLEARANCE
AROUND VENT PIPES
VENTILATING
AIR OPENING
VENTILATING
AIR OPENING
0”
RIGHT
12”
LEFT
14”
REAR
6”
FRONT
* AREA OF EACH OPENING:
645 SQ. MM PER 1000 BTU PER HOUR INPUT
WITH A MINIMUM O F64516 SQ. MM
RECOMMENDED SERVICE CLEARANCES:
FRONT
- 30” (762 mm)
TOP
- 24” (610 mm)
LEFT SIDE - 24” (610 mm)
REAR
- 24” (610 mm)
Figure 1-1 Closet Installation - Minimum Required Clearances
WARNING
WARNING
For closet installations, CPVC,
polypropylene or stainless steel
vent material MUST BE used in
a closet structure due to elevated
temperatures. Failure to follow
this warning could result in fire,
personal injury, or death.
For alcove installations, CPVC,
polypropylene or stainless steel
vent material MUST BE used in
an alcove structure due to elevated
temperatures. Failure to follow
this warning could result in fire,
personal injury, or death.