10
Products to avoid:
Spray cans containing chloro/fl uorocarbons
Permanent wave solutions
Chlorinated waxes/cleaners
Chlorine-based swimming pool chemicals
Calcium chloride used for thawing
Sodium chloride used for water softening
Refrigerant leaks
Paint or varnish removers
Hydrochloric acid/muriatic acid
Cements and glues
Antistatic fabric softeners used in clothes dryers
Chlorine-type bleaches, detergents, and cleaning solvents
found in household laundry rooms
Adhesives used to fasten building products and other
similar products
Areas likely to have contaminants
Dry cleaning/laundry areas and establishments
Swimming pools
Metal fabrication plants
Beauty shops
Refrigeration repair shops
Photo processing plants
Auto body shops
Plastic manufacturing plants
Furniture refi nishing areas and establishments
New building construction
Remodeling areas
Garages with workshops
Table 1A Corrosive Contaminants and Sources
1
Determine boiler location
(continued)
Failure to follow all instructions can result
in fl ue gas spillage and carbon monoxide
emissions, causing severe personal injury
or death.
WARNING
When using an existing vent system to
install a new boiler:
Check the following venting components before installing:
• Material
- For materials listed for use with this appliance,
see Section 3 - General Venting. For polypropylene or
stainless steel venting, an adapter of the same
manufacturer must be used at the fl ue collar connection.
• Size
- To ensure proper pipe size is in place, see Table 3A.
Check to see that this size is used throughout the vent
system.
• Manufacturer
- For a stainless steel or polypropylene
application, you must use only the listed manufacturers
and their type product listed in Tables 3E and 3G for CAT
IV positive pressure venting with fl ue producing
condensate.
• Supports
- Non-combustible supports must be in place
allowing a minimum 1/4" rise per foot. The supports
should adequately prevent sagging and vertical slippage,
by distributing the vent system weight. For additional
information, consult the vent manufacturer’s
instructions for installation.
• Terminations
- Carefully review Sections 3 through 5 to
ensure requirements for the location of the vent and air
terminations are met and orientation of these fi t the
appropriate image from the Sidewall or Vertical
options listed in the General Venting Section. For
stainless steel vent, only use terminations listed in Table
3H for the manufacturer of the installed vent.
• Seal
- With prior requirements met, the system should be
tested to the procedure listed in parts (c) through (f) of
the Removal of an Existing Boiler Section on page 11.
With polypropylene and stainless steel vent, seal and connect
all pipe and components as specifi ed by the vent manufacturer
used; with PVC/CPVC vent, see the Installing Vent or Air
Piping Section on pages 20 and 21.
WARNING
If any of these conditions are not met,
the existing system must be updated
or replaced for that concern. Failure to
follow all instructions can result in fl ue gas
spillage and carbon monoxide emissions,
causing severe personal injury or death.
Installation & Operation Manual