CHAPTER 2: SETTING INTO OPERATION
2-3
TURBO HB
2.3. Lifting the conveyor
(note: some conveyors have castors welded in place for shipping purposes)
Check to see that the lifting capacity of the hoisting crane, or lift truck, is adequate before
proceeding with the handling of the merchandise. No one should be near the hanging load,
or within the operating range of the overhead hoist/crane, forklift, or any other means used
for lifting and transportation.
Lifting points are strategically placed around the conveyor system to allow the conveyor to be safely lifted
with a fork truck or liting straps. Otherwise points under the system are marked with arrows for safe,
balanced, lifting points for fork trucks to lift the conveyor system. Always read the weight on the conveyor
and check it against the capacity of the lifting equipment before attempting to lift:
Summary of Contents for Turbo HB
Page 1: ...LNS SA CH 2534 Orvin www LNS group com Instruction manual ENG...
Page 2: ......
Page 5: ...CHAPTER 1 INTRODUCTION 1 1 TURBO HB CHAPTER 1 INTRODUCTION...
Page 9: ...CHAPTER 2 SETTING INTO OPERATION 2 1 TURBO HB CHAPTER 2 SETTING INTO OPERATION...
Page 19: ...CHAPTER 3 CONVEYOR BELT 3 1 TURBO HB CHAPTER 3 CONVEYOR BELT...
Page 29: ...CHAPTER 4 MAINTENANCE 4 1 TURBO HB CHAPTER 4 MAINTENANCE...
Page 31: ...CHAPTER 5 OPTIONS 5 1 TURBO HB CHAPTER 5 OPTIONS...