3
UNPACKING AND SET UP
1. After removal of shipping materials, remove the furnace from the pallet by removing the
three shipping screws securing the furnace to the pallet. One (1) screw is accessible by
removing the filter door. The remaining tw
o (2) are removed from under the pallet.
Remove auger motor assembly and furnace assembly package from Burn Pot door.
Furnace A
ssembly Package includes:
1-Fuel Delivery
Coupler
1-Barometric Draft Control
1 - Self Tapping Bolt
1- Hopper Hardware Bag
3 - Wire Nut connectors
2- Wooden Handles
2. Insert burner auger assembly into burner
auger tube and secure assembly with self
tapping bolt using hole provided in
burner auger tube. (See Figure 1).
3. Remove cover from auger motor. Fasten flex conduit extending from the electrical box to
furnace auger motor housing using conduit lock nut. (See Figure 1) See Step 4 under
storage bin set up for wiring procedures.
4. Slide wooden handles on door handle and heat exchanger.
Summary of Contents for America's Heat AH-100
Page 7: ...I Fig 1 YllUl...
Page 13: ...11 REPAIR PARTS Cabinet ModeiBM 620 9...
Page 15: ...12 REPAIR PARTS Model AH 170 Cabinet 11 16 Q 18...
Page 18: ...REPAIR PARTS Electrical tJ 20 6 14...
Page 23: ...17...
Page 25: ...BLOWER AH 170 ASSEMBLED DIRECT DRIVE FURNACE BLOWER 18a...
Page 28: ......
Page 29: ......