6
4’ & 8’ VAPOR TIGHT SLIM STRIP LIGHT
SURFACE MOUNT INSTALLATION
Section 1
READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION
7.
Use anti spread hardware to prevent fixture from
moving after installation. Slide anti spread screw (M3 x
40) through tooth lock washers (M3). Then slide screw
through holes in back of brackets.
8.
Thread anti spread nuts onto screws and tighen.
9.
The fixture will now be firmly in place.