Running Tests (page 2 of 3) Electrical Test in Progress
Lite-Check CERTIFIER 1200 Operations Manual
31
The electrical test of all circuits is in progress.
The duration in time the test has run so far is 7 seconds.
Voltage and current of all circuits are displayed.
The Air Leak test will start after all the electrical tests pass. If any electrical circuit test fails, all testing will stop. Then the
user will be given a chance to locate and correct the problem. After fixing the issue, the user may click on “Retry” to
retry the test. The “Retry” option will only show up if there is a failure.
Duration of the electrical test so far is 7 seconds.