Rev: 10.24.19
Page 4
CCD-0002685
Fig. 2
Awning Width is from
Centerline to Centerline of
Support Arm Assemblies
Awning
Rail
Floor Line
Awning Installation
1.
On the awning rail, mark the position of the centerlines of the support arm assemblies. Make sure that
the support arm assemblies will not interfere with any lights, vents or other obstructions.
2.
Using a non-permanent method of marking, mark a perpendicular line from the awning rail down to
the floor line. This is the centerline of the support arm assembly (Fig. 2).
Fig. 3
3.
Insert the drive head assembly shaft into the end cap (Fig. 3).
A.
Align the holes and secure with waxed screw.
B.
Repeat process for idler head assembly at opposite end of roll tube.
NOTE:
Keep the head of the wax screw
1/8
" from being fully fastened to avoid compromising the structural
integrity of the wax screw.
Drive Head
Assembly Shaft
Support Arm
Centerline
End Cap