![Lindsay Barrier Systems X-LITE Installation Manual Download Page 14](http://html1.mh-extra.com/html/lindsay/barrier-systems-x-lite/barrier-systems-x-lite_installation-manual_1919635014.webp)
Lindsay Transportation Solutions Sales and Services, Inc
(888) 800-3691 [U.S. toll free] or +1 (707) 374-6800
Lindsay Transportation Solutions Sales and Services, Inc
(888) 800-3691 [U.S. toll free] or +1 (707) 374-6800
14
Step 4 – Hang Rails
Components required:
• (3) W-Beam Guardrail - 4000443**
Hardware Required:
• (3) 5/8” x 10” Bolt -2001635
• (12) 5/8” x 1 ¼” Guardrail Bolt - 4001115
• (1) 5/8” x 2” Bolt - 2000302
• (8) Shear Bolts – K080123 (Kit of 8; 1 Required)
• (15) 5/8” Guardrail Nut - 4001116
• (1) 5/8” Nut - 2000468
• (1) Square Washer – BSI-1102027-00
• (8) 5/8” x 1 1/4” Guardrail Bolt - NOT INCLUDED
**If installing
a 50 ft system
, the system uses 4
sections of rail in stead of 3.
If you are attaching to
an MGS rail system
, a transition
guardrail panel is necessary.
Please reference
Appendix A for 50 ft. or MGS system
details.
Note:
For the system to telescope properly, the
forward most guardrail panel should always be on the
outside.
12. Before installing Rail 3 ensure that the blockout
at Post 5 has already been bolted on. Attach Rail
3 using the 5/8” x 10” bolt at Post 6, pass bolt
through the approach / front hole of post.
Note: Rail 3 is not attached to Post 5.
13. Splice Rail 3 with the existing rail using standard
5/8” x 1 1/4” bolts. [
NOT SUPPLIED WITH THE
SYSTEM.]
Ensure that the 10” bolt used secure the rail and
blockout passes through both sections of guardrail,
blockout and post.
Notes:
Rail Identification
POST 6
GROUND STRUT ASSEMBLY BETWEEN POSTS 1 AND 2
POST 1
POST 2
POST 3
POST 4
POST 5
POST 7
REV.
A
B
C
D
A
B
C
D
1
2
3
4
1
2
3
4
Doc. B100108
SHEET
1:50
B
SIZE
SCALE
BSI-1102002-00
DWG NO.
2 OF 2
B
POST 6
POST 2
POST 1
POST 3
NO BLOCKOUT ON POST 1
POST 4
POST 5
POST 7
194
7 5/8"
POST 7
POST 6
POST 1
POST 2
POST 3
POST 4
POST 5
RAIL DOES NOT ATTACH TO POSTS 3 OR 5
POST 7
POST 1
POST 2
POST 3
POST 4
POST 5
POST 6
RAIL 3
RAIL 2
RAIL 1
Attach Rails to Posts
Standard Bolts at Rail 3 and 4 Connection
Approach / Front
INSTALLATION MANUAL