31
lindab | we simplify construction
Smoke Control Damper
SDR
2
-M
Lindab reserves the right to make changes without prior notice
Last modified: 2021-10-26
Rev: 2021-03-26
Fig. 24
Example of installation in solid wall construction of fire compartment - vertical blade axis position.
Fig. 25
Example of installation in solid wall construction of fire compartment - horizontal blade axis position.
Position:
1. Damper SDR2-M
2. Solid wall construction
3. Fire resistant board
4. Fire stop coating thickness 1mm
5. Hinges
Cover of actuating mechanism
has to be removable after installation
Position:
1. Damper SDR2-M
2. Solid wall construction
3. Fire resistant board
4. Fire stop coating thickness 1mm
5. Hinges
Cover of actuating mechanism
has to be removable after installation