A-2
A-2
INSTALLATION
SAFETY PRECAUTIONS
Read entire installation section before starting
installation.
IDENTIFY AND LOCATE
COMPONENTS
If you have not already done so, unpack the SP-170T
from its carton and remove all packing material
around the SP-170T. Remove the following loose
items from the carton (see Figure A.1):
1. SP-170T
2. Gun and cable assembly
(1)
3. Literature and miscellaneous including:
a) This operating manual
b) A separate .030" (0.8 mm) contact tip
c) Hex key wrench for removal of drive roll.
4. 10 ft (3,0 m) work cable.
5. Work clamp.
6. Sample Spool of L-56 .025 MIG Wire.
7. Adjustable mixed-Gas Regulator & Hose.
(1)
The gun is ready to feed .023" – .025" diameter
wire.
ELECTRIC SHOCK can kill.
• Only qualified personnel should perform
this installation.
• Only personnel that have read and under-
stood the SP-170T Operating Manual
should install and operate this equipment.
• Machine must be plugged into a receptacle
which is grounded per any national, local
or other applicable electrical codes.
• The SP-170T power switch is to be in the
OFF (“O”) position when installing work
cable and gun and when connecting power
cord to input power.
WARNING
FIGURE A.1
1
2
3
4
5
WELDING AMP RANGE
25-125
6
7
SP-170T
Summary of Contents for SP-170T
Page 31: ...B 18 SP 170T B 18 APPLICATION CHART ...
Page 44: ...SP 170T NOTES ...