Page 6 of 24
Before installation, re-installation, or troubleshooting
• Stop the application
• Switch off the power supply and pull out the mains plug.
• Relieve the application of any loads, which may be released during the work.
Before start-up
• Make sure that the system has been installed as instructed in the User Manual.
• Make sure that the voltage of the control box is correct before the system is connected to the mains.
• System connection. The individual parts must be connected before the control box is connected to
the mains.
During operation
• Ensure that the cables are not damaged.
• Unplug the mains cable on mobile equipment before it is moved.
Information on the MJB
The MJB Modular Junction Box is designed for use together with OpenBus™ control boxes.
The MJB makes it possible to connect multiple handsets, attendant controls or it makes it possible
to use the MJB as a control unit for 3
rd
party products as Out of Bed detection, USB charger, Under
Bed Light etc.
LINAK A/S delivers only the OpenBus system and is not responsible for any products other
than LINAK products (i.e. products from 3
rd
party suppliers) or the compliance of such
products with the LINAK OpenBus
TM
system.
Summary of Contents for MJB
Page 1: ...Page 1 of 24 LINAK COM MEDLINE CARELINE MJB Gateway User manual...
Page 19: ...Page 19 of 24 MJB MJB Modular Junction Box DRAWING APPENDIX...
Page 21: ...Page 21 of 24...
Page 22: ...Page 22 of 24...
Page 23: ...Page 23 of 24...