The CBD must not be packed in heat insulating material, but must be placed so that it can emit waste heat into the
surroundings. There are no ventilation holes to consider, the CBD emits heat through the surface.
The plug must be visible when the CBD is mounted so that the supply to the CBD can be disconnected at replacement, if any.
The mounting screws on the control box must be fastened with a max. torque of 1 Nm.
The mounting surface to which the control box is attached should have a surface evenness of better than ± 0.5 mm.
CBD6 - bottom with cable grooves
The bottom of CBD6 is equipped with two cable grooves improving the cable management when mounting. The grooves can
be used to bypass the CBD for both motorcables and the mains cable (EU version only) from one side to the other, giving a
cleaner design.
.
Remember to lead the cables through the grooves before mounting the control box.
For mounting and operation of the desk panel, please see the separate user manual for desk panels.
Mounting guidelines CBD4/CBD5/CBD6
The control box is to be fastened with 4 screws (3 screws for CBD5 and CBD6) with a head diameter between ø 8 and ø
10 mm. Out of regard for the tension surface ø 10 mm is preferable due to lower surface tension. See drawing appendix for
placing of mounting holes and the space the CBD takes up.
CBD4 - Control box
CBD5 - Control box
CBD6 - Control box
Summary of Contents for Deskline DL7 system
Page 1: ...Page 1 of 24 LINAK COM DESKLINE DL7 system User manual...
Page 18: ...Page 18 of 24 DL7 DESKLINE DL7 System DRAWING APPENDIX...
Page 19: ...Page 19 of 24 DL7R CBD4 3 2 1 B AC B 4 278 80 100 6 119 62 51 247 5 5 5 5...
Page 20: ...Page 20 of 24 CBD5 CBD6...
Page 21: ...Page 21 of 24...
Page 23: ...Page 23 of 24...