24
• Following installation of the Stormaster GI terminal to the threaded
pipe as per drawing ST-2 and figure 13 it will be necessary to
connect the metallic pipe to a conventional downconductor in order
to convey the lightning energy to the earthing system.
• Ideally the connection between the metallic pipe and the
conventional downconductor should be completed by lugging
or exothermically welding (LPI EXOWELD) the downconductor at a
practical point somewhere along the length of the pipe.
• Particular care should be taken to ensure that compatible metals are
used when connecting the downconductor to the metallic pipe.
• For installation details of the conventional downconductor please
review instructions and comments as detailed under the heading
Installation of Conventional Downconductors on page 21.
Tools required for the completion of the HVSC Lower Termination
include:
• Compression or Mechanical Crimping Tool
• Sharp Knife
• Insulation Friction Cutting Tool
• Shifting Spanner
• Rubber Gloves
Lower Termination Kit Consists of
1 x Roll Denso Tape
1 x 95mm Crimp Lug
2 x Warning Stickers
1 x Earth Clamp
1 x Insulation Friction Cutting Tool
The following steps outline the termination of the lower end of the High
Voltage Shielded Cable to the lightning earth.
The inner screen copper conductors and the outer screen copper
conductors should be connected to the earthing system.
Termination of the HVSC Lower End
Summary of Contents for Stormaster ESE
Page 10: ...8 Figure 2...
Page 11: ...9 Figure 3...
Page 12: ...10 Figure 4...
Page 13: ...11 Figure 5...
Page 14: ...12 Figure 6...
Page 15: ...13 Figure 7...
Page 25: ...23 Figure 13 Figure 14...