ENGLISH
Operation:
Set up and fill in granulate:
Place the lightmaXX Vector Spark UP! on a flat and dry surface and fill the machine with the
granulate provided. To do this, remove the lid of the filling opening and then fill in the contents of
a bag of granulate. It is best to use a funnel for this. Then close the filling opening with the
appropriate lid again.
Start:
Connect the device to the mains via the PowerCon input using the power cable supplied with the
device.
Further devices can be supplied with power via the PowerCon Out mains output. Always connect
the PowerCon output with the PowerCon input of the next device until all devices are connected.
A total of up to 6 devices can be connected.
Switch on:
Switch the unit on with the power switch. The unit will now heat up for 5 minutes while the red
status indicator "HEAT" lights up. The display to the right of the status displays and operating
buttons shows the rising temperature during the heating phase. No sparks can yet be emitted
during the heating phase.
As soon as the heating phase is complete, the green status display "READY" lights up and the unit
is ready to emit sparks.
The unit can emit a fountain over a period of 30 seconds. After these 30 seconds the unit stops
automatically. The ejection must be reactivated.
Status display:
Display
Function
READY
The unit is ready for spark discharge
DMX
DMX mode activated
FAULT
Error message
(see Troubleshooting)
HEAT
The unit heats up, no sparks