background image

5. 

Connect mains cable to terminal block on assembly panel according to polarity shown. 
 

5.1  Connect the power supply wires to terminals L1, N1 of the terminal block in accordance with 

the specified polarity. 

6. 

When the luminaire with emergency unit is connected to mains for the first time it is 
recommended to wait for battery fully charges (24 hours). 

7. 

Click the assembly panel into luminaire’s body. 

8. 

Luminaries installation should be done with X5 mounting hardware kit (doesn’t included). 
Using of other mounting hardware will void the warranty. 

9. 

Lock two snap locks (on different sides of the body) with self-tapping screws 3,5х9,5 
(included). 

10.  To secure plastic snap locks from accidental release under external mechanical impact it is 

possible to lock them through pre-made holes with self-tapping screws 3,5х9,5 or 3х10 (not 
included in the package). 

 

CONNECTION SCHEMES 

1. 

Mains connection scheme. 

        

 

 

 

2. Mains connection scheme with backup power supply: (fig. а - backup power supply). 

 

 

 DIMENSIONS (IN MILLIMETERS) 

 

Summary of Contents for ARCTIC STANDARD 1200 TH 4000K

Page 1: ...ARCTIC STANDARD MANUAL BETRIEBSANLEITUNG ...

Page 2: ...by EN 62262 DELIVERY SET Luminaire pcs 1 Package pcs 1 Manual pcs 1 Cable gland pcs 2 M6 washer pcs 2 Rubber washer pcs 2 ARCTIC 2 wire pendant mounting kit to be ordered separately pcs 1 FUNCTION This LED luminaire is designed for illumination of premises with increased humidity Replacement of the luminaire light source is available in the factory or by a specialized service The luminaire corresp...

Page 3: ...aire disconnected from the mains supply The luminaire has passed the high potential dielectric strength test as per IEC 60598 1 2014 Do not cover the luminaire with insulating material INSTALLATION AND OPERATION RULES The luminaire should be used according to Standard code of customer electrical installations Installation cleaning and replacing of the components should be done only with the main p...

Page 4: ...washer 3 1 Suspended installation Drill installation holes in luminaire s body L distance between holes on fig а М6 steel washer b rubber washer с М6 nut 4 Put mains cable through cable gland which should have previously made opening with form of mains cable profile and a bit less in size Place the cable glands in appropriate holes in luminaire s body ...

Page 5: ... 8 Luminaries installation should be done with X5 mounting hardware kit doesn t included Using of other mounting hardware will void the warranty 9 Lock two snap locks on different sides of the body with self tapping screws 3 5х9 5 included 10 To secure plastic snap locks from accidental release under external mechanical impact it is possible to lock them through pre made holes with self tapping sc...

Page 6: ...llumination control system components supplied without luminaires is limited to 12 twelve months from date of delivery Warranty does not apply to color change of painted surfaces and plastic parts during luminaire operation Luminous flux level is at least 70 of the nominal value during the warranty period Warranty will cover the entire period given that assembly installation and operation of lumin...

Page 7: ...EN 62262 LIEFERKASTEN Leuchte Stückzahl 1 Paket Stückzahl 1 Betriebsanleitung Stückzahl 1 Kabelverschraubung Stückzahl 2 M6 Dichtungsring Stückzahl 2 Gummi Dichtungsring Stückzahl 2 ARCTIC 2 Drahtseil Montageset separate zu bestellen Stückzahl 1 FUNKTION Diese LED Leuchte wurde zur Beleuchtung für Bereiche mit erhöhter Luftfeuchtigkeit entwickelt Ersatz der Lichtquellen ist in der Werkstätte oder ...

Page 8: ...romnetz getrennt werden Die Installation und Instandhaltung der Leuchte darf nur bei ausgeschaltetem Strom erfolgen Die Leuchte hat den Hochpotenzial dialektrischen Stärketest gemäß IEC 60598 1 2014 bestanden Nicht mit Isoliermaterial bedecken INSTALLATION UND INBETRIEBNAHME Die Leuchte sollte gemäß der Normung für elektrische Montagen erfolgen Montage Reinigung und Komponentenersatz sollte nur mi...

Page 9: ...s Leuchtengehäuse L Abstand zwischen den Öffnungen in Abbldg а Gummi Dichtungsring b М6 Stahl Dichtungsring 3 1 Pendelmontage Bohren Sie Montagelöcher in das Leuchtengehäuse L Abstand zwischen den Öffnungen in Abbldg а М6 Stahl Dichtungsring b Gummi Dichtungsring с М6 Schraube ...

Page 10: ...tt aufgeladen ist 24 Stunden 7 Setzen Sie die Abdeckung in das Leuchtengehäuse ein 8 Die Leuchtenmontage sollte mit dem X5 Montagekit nicht inkludiert erfolgen Nutzung eines anderen Montagekits macht die Garantie ungültig 9 Schliessen Sie die beiden Schnappverschlüsse an beiden Seiten des Leuchtengehäuses mit selbstschnappenden Schrauben 3 5х9 5 inkludiert 10 Sichern Sie die Plastik Schnappverschl...

Page 11: ...n Rechts Die Garantiezeit beträgt 60 Monate ab dem Lieferdatum vorbehaltlich der hier genannten Bedingungen und auf der Website des Herstellers unter https www ltcompany com de terms Die Gewährleistung gilt nicht für den Farbwechsel von lackierten Oberflächen und Kunststoffteilen während des Leuchtenbetriebes Garantiezeit von Notstromversorgungsaggregaten Lieferung inklusive Akku und Steuerungsmod...

Page 12: ...uchte ist zertifiziert Herstellungsdatum _________________________________________________________________________ Geprüft von _____________________________________________________________________________ Verpackt von _____________________________________________________________________________ Firmenstempel Hersteller Adresse Magistralnaya st 11 a Ryazan 390010 Russland Verkaufsdatum ____________...

Reviews: