15
ENGLISH
• Even the fan grille’s rear part has to be
cleaned if needed, by vacuuming or drying
with a damp cloth/sponge
5.
6.
1.
2.
• The package consists of items for installation
of the product; these items underwent tests
and are able to bear up to 60 kg of load.
• 4 chains with a length of 400 mm
• 4 M5 tie-down lugs (anchor brackets)
• 4 nuts & 4 washers
• 4 S-hooks
•
Take away / Unscrew 4 screws/bolts which
are placed in the four corners of the backside
of the product, see the picture.
(use the appropriate tool)
CEILING MOUNTING
Important!
When choosing the fastener for the ceiling it is
very important to consider the following....
• Regardless of the surface, hooks / screws / plugs must be
able to support a weight of at least 60 kg.
• Refer to the weight specifications from manufacturer when
choosing the fastener.
• It is important that the product is suspended horizontally.
• The base plate must not be installed on ceiling mounting!
Summary of Contents for CellFlow Pro900
Page 1: ...CellFlow Pro900 Manual Clean Air Technology SVENSKA ENGLISH DEUTSCH 中文 简体 CFPro900 ...
Page 9: ...9 ...
Page 17: ...17 ...
Page 25: ...25 ...