Liftket LSF 200/1-15 Operating Instructions Manual Download Page 7

 

 

7

 

Technical overview 

 
Figure 1: Layout of the wire rope winch with foot support 
 
 

2.1 

Explanation of type designation 

 
Example: 

LSF   200  /  1   -   15 

 
 

 

 

 

 

 

 

lifting speed [m/min] 

 

 

 

 

 

 

 

load capacity [kg] 

 

 

 

 

 

 

 

wire rope winch 

 
 

2.2 

Technical data of the wire rope winches 

 

 

 

LSF 200/1-15 

duty group FEM 9.511 

 

2m 

voltage 50 Hz, 3 phases 

V

 

400 

motor power 

kW

 

0.55 

load capacity 

kg

 

200 

lifting speed 

m/min

 

15 

max. lifting height 

m

 

120 

wire rope- Ø DIN 3069  

mm

 

min. break force of the wire rope 

kN

 

14.5 

weight of the wire rope winch 

kg

 

42 

fuse 

A

 

10 

cable for power supply 

mm²

 

5 G 1.5² 

intermittent duty (duty rate; starts per hour) 

 

40% ED; 120 S/h 

short time duty* 

min

 

40 

 
*  description of short time duty: 

Short time duty means the permissible uninterrupted operating periods without cooling interval. After having 
reached the maximum running time a break is required and the wire rope winch can be further used in intermittent 
duty mode., i.e. the wire rope winch can be used keeping the max. duty rate. 

 
Table 1: Technical data of the wire rope winch 

control box 
 
 
motor with  
DC brake 
 
 
 
power supply  
cable 
 
 
 
 
 
 
 
control pendant 

rope drum 
 
 
actuator for 
electric limit 
switch for lifting  
 
 
 
 
 
 
hook tackle 

Summary of Contents for LSF 200/1-15

Page 1: ...rating Instructions Wire rope winch Type LSF 200 1 15 Please do not use the electric chain hoist before all operators have carefully read and understood this manual and signed the form on the rear cov...

Page 2: ...2 LIFTKET Hoffmann GmbH Dresdener Stra e 66 68 04808 Wurzen Germany 49 3425 89 24 0 49 3425 89 24 99 sales liftket de www liftket de Ho 08 2017 englisch Original operating instructions 2017...

Page 3: ...0 4 3 1 Layout 10 4 3 2 Adjustment of the electric limit switch 11 4 3 3 Hazardous operations 11 5 Directions and prohibitions for use 12 5 1 Directions for use 12 5 2 Prohibitions of use 12 6 Mainten...

Page 4: ...4...

Page 5: ...ecessarily cover all situations If you are in any doubt please contact your dealer This manual will tell you how to operate the wire rope winch and how to handle its suspension or its loads safely It...

Page 6: ...hoisting and travelling motors FEM 9 751 1998 Series lifting equipment Power driven series hoist mechanisms Safety FEM 9 755 1993 Serial hoist units Measures for achieving safe working periods DIN 15...

Page 7: ...of the wire rope winch kg 42 fuse A 10 cable for power supply mm 5 G 1 5 intermittent duty duty rate starts per hour 40 ED 120 S h short time duty min 40 description of short time duty Short time dut...

Page 8: ...d Check that the rope winds properly onto the drum on initial use If the rope winds onto one side of the drum only please check if the winch is fitted absolutely horizontally In case of loose rope the...

Page 9: ...required Caution The wall surface must be horizontal Test Check the correct assembly according to point 3 1 4 Electrical connections After installation check that it has been done in accordance with t...

Page 10: ...or the mains connection are located in the separate control box A cable 4G1 5 minimum cross section 1 5 mm is necessary for the mains connection After connecting press button for lifting If the load m...

Page 11: ...he highest hook position is reached in this case the limit switch won t work anymore and this could cause a rope or winch casing to break and the load to be dropped Further operation of the wire rope...

Page 12: ...visible all the times for the operator and if more than one person is involved in the operation they must be able to communicate with each other at all times If the hoist is not in use the load must...

Page 13: ...qualified specialist personnel or the manufacturer s after sales service personnel If the hoist is in heavy use two or three shifts high percentage of work with nominal load dusty or high temperature...

Page 14: ...81 5 m and the diameter of it 5 mm The drum therefore is designed for 5 layers of wire rope Figure 9 Replacement of the wire rope at the drum Assembly instructions Release the wire rope by pressing t...

Page 15: ...C disk brake The brake is supplied by a rectifier circuit which is located in the control box It operates according to the fail safe principle If there is a power failure the brake acts automatically...

Page 16: ...r by use of the hexagon screws 3x M5 5 Tighten the screws with equivalent torque of 5 5 Nm Assembly of the hub onto the shaft Assembly of the DC disk brake on the gear cover Tightening by a torque wre...

Page 17: ...lar intervals 3 months minimum if very dirty concrete cement this work should be done more often Supplier Designation Application Elaskon Elaskon SK H Secondary lubrication Elaskon Elaskon 30 Secondar...

Page 18: ...components have reached the end of the S W P the wire rope winch or its components have to be overhauled or to be taken finally out of operation The parts have to be disposed in accordance to the law...

Page 19: ...19...

Page 20: ...rther information for other fields of operation are not considered herewith If changes to the normal operations are discovered such as unusual noise vibrations higher input current or frequently blowi...

Reviews: