11
1. As Fig.5, slide the end rail into the 1st sleeve, slide the middle rail into the 1st sleeve;
2. As Fig.6, slide the 2nd sleeve to the other end of middle rail, slide the top rail into the 2nd sleeve;
3. Remove the plastic film on the end rail, cut the plastic cable tie on the screw rod
”A”;
4. As Fig.7, pull the screw rod
”A” along with inner chain to the end of top rail ;
5. As Fig.8, undo the nut & spring;
6. Tight the nut to the right position as shown in Fig.9, cut the plastic cable tie on sprocket. Rail is now
assembled.
Installation
Fig. 8
1. Fix the track bracket to the wall 2cm-15cm over the shaft or intermediate bracket (depending on the
actual installation space).
Summary of Contents for LA-SDO1
Page 10: ...10 Fig 8 Fig 9 19MM B...