22
TOOLS AND HARDWARE REQUIRED FOR THIS PAGE
!*)
Attach the
Rim (ALX)
to the
"ACKBOARD!*)
and
Top Pole (ALH)
by
securing a
v.YLOCK.UT!!/
with a
v7ASHER!"$
onto the
5/16” x 4 1/2” Carriage Bolt (APO)
. Also secure a
v&LANGE,OCK.UT
(APN)
onto the
5/16” x 4” Carriage Bolt (APP)
.
SEC
2.4
(x1)
AAO
(x1)
ABD
(x1)
APN
(x1)
APN
AAO
ABD
ALH
APO
APP
Note: Tighten all hardware until it is fl ush with the Pole.
Do not overtighten the hardware.
!