background image

SM51 Unpacking & Assembly Instructions

7

4. 

Mount the 56” lat top

 (part T from 

HARDWARE

 section) to the 4-stack cell using a

5/8” socket and combination wrench. Insert two of the large 7/16” by 6” bolts using the
hardware configuration shown in Figure 7. Mount the 29” tricep top (part U in

HARDWARE

 section) to the frame and connecting beam (See Figure 7).

Figure 7. Configuration for 6” bolts.

Figure 8. Mount the weight stacks.

5. 

Mount the weight stacks to the 4-stack cell.

 To do this:

A. 

Remove the tricep back rest bolts

 using a 9/16” socket and combination

wrench (see Figure 9).

B. 

Unbolt the top plate and remove the guide rods

 using a 9/16” socket and

combination wrench (see Figure 9).

Summary of Contents for SM51

Page 1: ...M051 K50 B112 1 5 STACK MULTI JUNGLE SM51 WITH 2 ADJUSTABLE PULLEYS UNPACKING AND ASSEMBLY INSTRUCTIONS...

Page 2: ...RE LARGE AND HEAVY USE CAUTION WHEN ASSEMBLING THIS MACHINE MATERIALS AND TOOLS REQUIRED FOR ASSEMBLY 1 2 3 8 5 8 9 16 Socket wrench 1 8 Hex key wrench 5 8 9 16 Combination wrench Pinch bar You will a...

Page 3: ...the shipping wrapper 2 Remove the parts box and shipping boards 3 Remove the items in the parts box These items are shown in Figure 1 A Remove the bolts bag B Remove the parts shown below Parts that a...

Page 4: ...s seats and cables removed for clarity 1 1 stack cell 2 4 stack cell 3 Lat bench 4 Connecting beam 5 Lat top 6 Tricep top 7 Low row bench 8 300 lb Weight stacks 2 9 190 lb Weight stacks 3 1 Place the...

Page 5: ...cell using two 3 8 x 2 3 4 hex head bolts used to bolt the cross beam to the cross members and the adjustable pulley tops to the top beams Include the 3 8 flat washer end cap washers end caps and 3 8...

Page 6: ...nd of these instructions end cap washers and end caps parts F and H in HARDWARE section Figure 6 shows the connected cells You will need to remove the pulleys from the teardrop pulley assemblies to ga...

Page 7: ...in Figure 7 Mount the 29 tricep top part U in HARDWARE section to the frame and connecting beam See Figure 7 Figure 7 Configuration for 6 bolts Figure 8 Mount the weight stacks 5 Mount the weight sta...

Page 8: ...e pull pins facing upward You will need to flip the stacks over so that the pull pins are facing outward when they are loaded onto the machine Since the pull pins will be facing downward when they are...

Page 9: ...ossover weight stack NOT intended for the tricep pushdown weight stack the one with the tricep back rest mounted to the frame as shown in Figure 9 using a 7 8 combination wrench You will need to remov...

Page 10: ...t with flat washers end cap washers and end caps When you remove the bolts leave the pulley bolt and pulley out since you will need to thread the cable with the pulley removed Figure 13 Mount adjustab...

Page 11: ...SM51 Unpacking Assembly Instructions 11 Figure 15 Bolt the benches to the frame...

Page 12: ...th and the adjustable crossover cables can be identified by the ball on the end of the cable The routings for these cables are shown in the figures below NOTE YOU MUST REMOVE ALL PULLEYS TO ROUTE THE...

Page 13: ...Once you ve removed the pulleys as described previously route the adjustable crossover cable on the 4 stack cell as shown in Figure 17 The crossover cable is routed at the factory on the 1 stack cube...

Page 14: ...end detail Using a 7 8 wrench tighten the jam nut onto the adjustable pulley threads as shown in Figure 18 Place a rubber cap on the top of the cable as shown in Figure 18 right LOW ROW CABLE ROUTING...

Page 15: ...t left Screw the bolt down into the weight stack as shown at right Tighten the bolt with a 7 8 combination wrench Figure 20 Screw the cable into the weight stack LAT PULLDOWN CABLE ROUTING Route the l...

Page 16: ...sembly Instructions 16 TRICEP PUSHDOWN CABLE ROUTING Route the tricep pushdown cable as shown in Figure 22 Screw the cable into the weight stack as shown previously in Figure 20 Figure 22 Tricep pushd...

Page 17: ...SM51 Unpacking Assembly Instructions 17 HARDWARE 0 1 2 3 4 5 6 Hardware Figure 1 Assembly Parts...

Page 18: ...cap will fit on the nut D 7 16 hex head nut E 3 8 x 3 hex head bolt used to bolt the cross beam to the cross members the adjustable pulley tops to the top beams and the bottom bolts on the lat bench...

Page 19: ...es to the weight stacks Hardware Figure 3 Cable jam nut M Cable jam nut Hardware Figure 4 shows the types of cables that are included with the SM51 Hardware Figure 4 Cables N Lat pulldown cables same...

Page 20: ...Instructions 20 Hardware Figure 5 Top assemblies S Teardrop pulleys bolt on above lat and seated row bench 2 T 56 Lat top bolt to top of 4 stack cell with pulleys above lat bench 1 U 29 Tricep top bol...

Page 21: ...tions 21 Hardware Figure 6 Weight stack rubber bumpers W Weight stack rubber bumpers inserted under weight stacks 8 Hardware Figure 7 Floating pulleys X Floating pulley bolt to 190 lb weight stack oth...

Page 22: ...ustable crossover cable 1 4 1 1 1 2 0017 00101 1561 0017 00104 0363 0017 00104 0366 0017 00103 0233 6 bolt hardware A B C D 7 16 x 6 hex head bolt 7 16 flat washer 7 16 cap washer 7 16 Nyloc nut 6 6 6...

Page 23: ...s 23 0017 00101 1413 0017 00104 0368 0017 00103 0217 Pulley hardware installed 1 3 4 Bolt Cap washer 3 8 Nyloc nut 0017 00101 1413 0017 00104 0313 0017 00103 0217 Floating pulley hardware installed 1...

Reviews: