25
STEP 28:
FIGURE 28
1
69
65
3/8 X 61m 54
4
5
66
67
•
SECURELY
assemble the COUNTERBALANCE (1) to the PIVOT ARM (5) using four RH CAPS (69), two 3/8 X 61mm BOLTS (54), four
3/8” SAE WASHERS (66), four 3/8” RH WASHERS (67) and two 3/8” LOW HEIGHT LOCK NUTS (65) as shown in FIGURE 28.
•
SECURELY
assemble the PRESS ARM (4) to the PIVOT ARM (5) using two RH CAPS (69), two 3/8 X 43mm BOLTS W/LOCTITE
(52), two 3/8” SAE WASHERS (66) and two 3/8” RH WASHERS (67) as shown in FIGURE 28.
0
1
1/2
1/2
1/2
1/2
1/2
1/2
2
3
4
5
6
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
3/8 X 43mm 52
W/LOCTITE