Install Front and Top Caps
1.
NOTE:
OPTIONAL:
If your product does not include front shrouds, skip this step.
Set front shrouds into the bottom cap. Install screws securing the front cap to the tower frame using a 10 mm
wrench.
Item
Description
Qty.
1
Front Cap
1
2
Front Shroud, Left
1
3
Front Shroud, Right
1
4
Screw, M6, HCS, 50 mm
4
Tighten hardware to 10-13 in-lb (1.1-1.5 Nm).
2.
Install screws securing the front cap to the tower frame using a 10 mm socket wrench and ratchet.
NOTE: Screw heads can be accessed from the top or bottom.
Item
Description
Qty.
1
Front Cap
1
2
Screw, M6, HCS, 50 mm
4
Tighten hardware to 10-13 in-lb (1.1-1.5 Nm).
3.
Press grommets into holes at the top of the tower frame.
Page 21 of 35