Chapter 2 Mechanical Installation 13
Liebert NXC 30kVA And 40kVA UPS User Manual
2.6.3 Cable Access Mode
The UPS adopts top cable access method and bottom cable access method.
For details, refer to
3.1.10 Power Cable Connection Steps
and
3.2.11 Signal Cable Connection Steps
.
2.6.4 Final Positioning And Fixing
After the final positioning of the UPS, use the four adjustable feet to fix the UPS on the floor, as shown in Figure 2-6.
Method:
1. Loosen the nuts from bottom to top.
2. Rotate the feet down to touch the floor.
3. Plug the foot fixing pieces to the feet.
4. Align the foot fixing pieces with the installation holes dug according to dimensions shown in Figure 2-7.
5. Rotate the nuts from top to bottom till the nuts firmly press the foot fixing pieces, and then use the fixing bolts M10 to
fix the UPS on the floor.
Figure 2-6 Schematic diagram for UPS positioning and fixing
2.7 Installation Drawings
Figure 2-7 describes the key mechanical characteristics of the UPS.
Lower left corner of the cabinet (amplified view)
Nut
Foot fixing piece
Foot
Installation hole
Summary of Contents for NXC 30kVA
Page 2: ......