INSTALLATION TYPES
If you have the ability to plumb a complete second discharge piping network for your new backup, this is the best possible installa-
tion, as it offers you an added backup solution in the event the primary pump discharge ever becomes blocked. To accomplish this,
install a 90° street elbow (included) into the 442 (tightening to 15 in-lb) and plumb a second line. Two alternate methods of installing
a 442 into existing primary pump piping are shown below.
Method B:
Side-by-side Installation, a popular option in larger sump pits when it is desirable to have the backup pump and primary
pump on the same level. This installation will require a tee, a 90° elbow, and two sections of piping. A 90° street elbow is supplied.
Method A:
Vertical installation is recommended for compact sump pits and sump pits where the buildup of sediment (rocks, sand,
mud, etc.) is an issue. The 442 comes with all fittings for this installation (included 90° street elbow is not used in this installation).
Left:
Side view of a typical vertical installation. Note
the distance between the primary pump and backup
pump base.
Right:
Top-down view of a typical vertical installation.
Integrated check valve
Check valve
Left:
Side view of a typical side-by-side installation.
Right:
Top-down view of a typical side-by-side installa-
tion.