
6
iR37 Build & Operations Manual • LIBERTY AV
3. ASSEMBLY – FLOOR STAND
There are two boxes for the floor stand.
1. Polished stainless steel column 9 shown above wrapped.
a. With pre-drilled and tapped bolt holes top (#5) and bottom (#6).
2. Floor base with
a. 1x pack of screws with
• 6 x dome cross head bolts
• 5 x cross head countersunk bolts.
b. 1 x top plate mirror polished and pre-drilled and countersunk 5 holes.