
5
iR37 Build & Operations Manual• LIBERTY AV
b. Leave large vinyl washer in place.
c. Thread captive cables x3 through base aperture, fattest first, top in bottom out.
d. Thread cables through black threaded collar.
1. Do largest connector first then in diminishing size. For ease, do largest connector first then in diminishing size.
2. Thread collar onto pole.
3. Hand tighten clamping column and base together – ensure base is orientated such that the cable slot is to the
rear of iR37.
4. Fanout cables to rear of screen base aperture.
5. Place into position.
6. Connect LV connector to captive connector of same type.
7. Connect IEC to PSU.
8. Plug in power cable to 13a socket.
9. Switch on power at socket.
* Note there is
NO
on/off switch on the iR37 unit itself.
o posi
Connect IEC to PSU