38
Air-to-Water Heat Pump
Make sure that all the cables are fed through the cable glands at the top of the unit.
In order to ensure water tightness of the cable routing follow the below instructions:
1. Make a small hole in the thin rubber membrane for each cable.
2. Push the cable through making sure the membrane isn’t damaged and that the membrane tightly
wraps the cable.
3. Pull the cable back for approximately 5 mm to make a positive seal.
Make sure only one cable is fed through each cable gland hole to ensure a proper water tightness
seal.
Installation of Indoor Unit
1,MFL69676201,영영 2017. 3. 8. 영영 3:07 Page 38