6
INSTALLATION STRUCTURE
ENGLISH
INSTALLATION STRUCTURE
Installation structure diagram
Cautions in installation structuring
• A facility company is responsible for MCC construction work, and a separate discussion should
be made before an installation.
• A temperature sensor or a temperature/humidity sensor should be installed to at SA (supply air)
/ RA (return air) ducks to ensure a normal operation.
sa
oa
ra
Power line
①
②
③
Communication line
Piping sensor
Temperature/humidity sensor
Refrigerant piping
⑤
⑥
⑦-1
⑦-2
⑧
⑨
⑩
④
NO.
Item
Specification
①
AIR HANDLING UNIT
-
②
Control Kit
PRCKD42E
③
Expansion Kit
PATX13A0E/20A0E/25A0E/35A0E/50A0E
④
Outdoor unit
MULTI V
⑤
Piping temperature sensor IN
Sensor : Ø 5, length : 10 m, line color : Black
⑥
Piping temperature sensor OUT
Sensor : Ø 7, length : 10 m, line color : Red
⑦
-1, 2
Temperature/humidity sensor
RA, SA
-40 °C ~ 70 °C, RH 0 ~ 95 %/AC 24 V/DC 0 ~ 10 V
⑧
Supply air fan
-
⑨
Inverter drive KIT
PTND01B0E
⑩
MCC
MCC distributing board PANEL
Summary of Contents for PTND01B0E
Page 10: ...10 WIRING DIAGRAM ENGLISH WIRING DIAGRAM PTND01B0E ...
Page 29: ......