Do not remove power from the controller during this reboot, which may take up to seven or more minutes to complete. Removing power
could make the unit unrecoverable. If desired (and convenient), you can use a serial shell connection to the controller to monitor progress as
files are installed and the unit is prepared.
Note that firmware upgrades occur before the platform daemon starts in the MultiSITE VM3 controller. Therefore, it is safe to interrupt power
anytime after you can re-open a platform connection to the controller.
3. Click the Close button to exit the wizard.
When the MultiSITE VM3 reboots, your platform connection to the controller closes. Notice that in the Nav tree, the platform instance for
that MultiSITE VM3 is now dimmed. Assuming that you changed the MultiSITE VM3’s IP address in commissioning, right-click and close that
platform instance, as this would make that connection instance invalid.
If you did not change it’s IP address, after several minutes you should be able to double-click the platform instance again to reconnect.
Note:
Going forward, you must access the MultiSITE VM3 by its new (assigned) IP address. Note that your MultiSITE Supervisor keeps a history of
TCP/IP changes made.
Figure 27: Completing Commissioning.
RUNNING THE COMMISSIONING WIZARD