Installation
10
10
1. Follow the pipe path. Bend the pipe more than 3 times in 1 location and do not bend in the opposite direction. (This will
strengthen the pipe.)
2. After deforming the pipe, align the union fitting and center of the pipe, and tighten it with the wrench.
3. Connect the pipe to the service valve of the outside unit.
4. After finishing the piping work, check if there is any gas leakage
5. For the flare nut, always use the material that complies with Standard or better.
6. After completing the connection of the pipe, vacuum dry the indoor unit and the connecting pipe.
For the vacuum drying, you must use service ports of both the gas and liquid pipes.
CAUTION
When using two wrenches, tighten at regulated torque
* For the pipe connection, use the method of connecting the end of the pipe to the branch pipe. The refrigerant pipe
coming out from the outside unit is branched out at the end and is individually connected to the indoor unit.
WARNING
• Always be careful not to leak the refrigerant during the welding.
• When the refrigerant is combusted, it generates a toxic poisonous gas.
• Do not execute the welding work in a closed location.
• Always do a leakage test after welding the pipes.
Pipe Size
Tightening Torque
(mm)
(N·m)
(kgf·cm)
Ø6.35
18~25
180~250
Ø9.52
34~42
340~420
Ø12.7
55~66
550~660
Ø15.88
63~82
630~820
Ø19.05
99~121
990~1,210
After completing work, securely tighten both service ports and caps so that gas does not leak.
Open status when both the pipe and
the valve are in a straight line.
Cut both the pipe and the valve with a
cutter to suit the length
(Don't cut the length of less than 70mm)
CLOSE
OPEN
5) Pipe connection