Regulation for refrigerant leakage
: the amount of refrigerant leakage should satisfy the following equation for human safety.
p
If the above equation can not be satisfied, then follow the following steps.
- Selection of air conditioning system: select one of the next
1. Installation of effective opening part
2. Reconfirmation of Outside Unit capacity and piping length
3. Reduction of the amount of refrigerant
4. Installation of 2 or more security device (alarm for gas leakage)
- Change Indoor Unit type
: installation position should be over 2m from the floor (Wall mounted type
’
Cassette type)
- Adoption of ventilation system
: choose ordinary ventilation system or building ventilation system
- Limitation in piping work
: Prepare for earthquake and thermal stress
Total amount of refrigerant in the system
≤
0.44 ( kg / m
3
)
Volume of the room at which Indoor Unit of the least capacity is installed
Note:
Fill in the f-gas Label attached on outside about the quantity of the fluorinated greenhouse gases
①
Manufacturing site (See Model Name label)
②
Installation site (If possible being placed adjacent to the service points for the addition or removal of
refrigerant)
③
The total Charge (
①
+
②
)
▶
Refer to model information since the CF Value of correction factor differs depending on model.