38
Outdoor Unit
• Pipe installation from outdoor units to HR units
: 3 pipes(Low pressure Gas pipe, High pressure Gas pipe, Liquid pipe)
• Pipe installation from HR units to indoor units
: 2 pipes(Gas pipe, Liquid pipe)
B
A
1
HR1
Outdoor
Unit
Indoor Unit
Y Branch pipe
Low pressure Gas pipe
High pressure Gas pipe
Liquid pipe
Gas pipe
Liquid pipe
Head Branch pipe
Indoor
Unit
Pattern 7
Pattern 8
HR1
A
A
A
48k
48k
1
2
• * : Serial connection of HR units : Capacity sum of indoor units ≤ 192 kBtu/h
• * : Maximum indoor units per a branch are 8 indoor units
HR2
48k
48k
3
4
HR3
48k
48k
5
6
*
HR1
48k
48k
1
2
HR2
*
B
12k
12k
12k
12k
3
4
5
6
24k
7
24k
8
Refrigerant piping system
Summary of Contents for Multi V ARUB Series