5-10
COMPONENTS
TEST PROCEDURE
RESULTS
HEATER ELEMENT
(Wire leads removed.)
THERMOSTAT
FUSE
(Wire leads removed.)
Measure the resistance.
(Multi-meter scale:RX1)
Measure the resistance with 500V-100M
Ohm insulation resistance meter.
Check the continuity of the switch
with an Multi-meter
Normal:
Gill heater
Approx.15
Ω
(at 20-30
o
C)
Normal:
more than 1.0M
Ω
NOTE: Make sure heater is fully cooled when tested.
NOTE: If the fuse is blown, check primary, the secondary, the monitor
switches, H.V.D and H.V.C before replacing the fuse.
If the fuse is blown by improper switch operation replace the defective
switch and the fuse at the same time.
Replace just the fuse if the switches operate normally.
0°C~Approx 110°C
Over 180°C
Normal
Abnormal
Summary of Contents for MH-1446SQP
Page 9: ...SCHEMATIC DIAGRAM 4 3 ...
Page 28: ...6 1 EXPLODED VIEW INTRODUCTION MODEL MH 1446SQP EV ...
Page 29: ...6 2 13213A 13552A 15006A 13581A 13536A 14026A 14970A 13720D 14890A DOOR PARTS EV ...
Page 30: ...6 3 23572A 24781M WTP018 268711 24510L 250201 24970A 23506A CONTROL PANEL PARTS EV ...
Page 32: ...6 5 43501A WSZ085 466001 466001 466003 43500A LATCH BOARD PARTS EV ...
Page 34: ...6 7 WTT021 63302A 63303A 56170D WSZ002 948502 65006B BASE PLATE PARTS EV ...
Page 35: ......