–19–
⑦
Set the both 3-way(liquid side) and 3-way(gas side) valves to open position with the Hexagonal
wrench for the unit operation.
⑧
Checking a gas leakage for the left piping
• Connect the manifold gauge to the service port of 3-way(gas side) valve.
Measure the pressure.
• Keep it for 5 - 10 minutes.
Ensure if the pressure indicated on the gauge is as same as that of measured at first time.
CLOSE
CLOSE
Closed
Closed
Indoor unit
Outdoor unit
Liquid side
Gas side
Summary of Contents for LP-8091PC
Page 1: ...Package Air Conditioner SERVICE MANUAL MODEL LP 8091PC Библиотека СОК ...
Page 42: ...9 Electronic Control Device 42 9 1 MAIN P C B ASSY ...
Page 44: ...10 Schematic Diagram 44 Circuit and Troubleshooting ...
Page 46: ... 46 14 17 10 19 29 1 13 11 8 1 15 12 8 9 20 22 5 6 7 2 4 3 2 1 16 ...
Page 49: ... 49 Outdoor Unit 4 1 4 2 4 4 4 3 12 8 ...
Page 52: ...P No 3828A30074W April 2000 Printed in Korea ...