Installation
1. Form the piping according to its routing. Avoid bending and
bending back the same piping point more than three times.
(This will result in hardening the pipe.)
2. After deforming the piping, align centers of the union fitting of
the indoor unit and the piping, and tighten them firmly with
wrenches.
3. Connect pipe to the service valve or ball valve which is located
below the outdoor unit.
4. After completing the piping connection, be sure to check if
there is gas leakage in indoor and outdoor connection.
After completing the piping connection, execute vacuum drying for
the connecting piping and the indoor unit.
The vacuum drying must be carried out using the service ports of
both the liquid and gas side valves.
CAUTION: Use two wrenches and
tighten with regular torque.
Outd oor
unit
Liquid side
Flare connection
Flare connection
Gas side
Indoor
unit
Spanner
Torque
wrench
Piping Connection
Vacuum drying
Flare nut fastening torque
Ø6.35mm
1.8~2.5 kgf.m
Ø9.52mm
3.4~4.2 kgf.m
Ø12.7mm
5.5~6.6 kgf.m
Ø15.88mm
6.3~8.2 kgf.m
Ø19.05mm
9.9~12.1 kgf.m
Grade
Liquid side piping Gas side piping
18k
Ø6.35mm
Ø12.7mm
24k
Ø6.35mm
Ø15.88mm
36k
Ø15.88mm
48k
Ø9.52mm
Ø9.52mm
Ø19.05mm
20 Ceiling Cassette Air Conditioner
Summary of Contents for JT-C186PLE0
Page 3: ......
Page 4: ......
Page 8: ...Remote Controller Anti bacteria Air Outlet Air Inlet ...
Page 9: ......
Page 14: ......
Page 15: ......
Page 22: ...22 Ceiling Cassette Air Conditioner ...
Page 25: ......
Page 26: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ...S M S ...
Page 35: ......
Page 36: ......
Page 37: ...Installation Manual 37 ...
Page 38: ......
Page 39: ......
Page 40: ...P No MFL42291408 ...