7.Air
Purging
ofthe
ConnectingPipes
andthe
IndoorUnit
21
Indoor unit
Liquid side
Outdoor unit
OPEN
CLOSE
V accum pump
Gas side
Closed
Closed
2-way v
alve/
3-way v
alve
3-way
valv
e
Theair
whichcontains
moistureremaining
inthe
refriger
ationcycle
may
causea
malfunction
onthe
compressor.
1.Confir
mthat
boththe
liquidside
valv
eand
thegas
sidev
alve
areset
tothe
closedposition.
2.After
connectingthe
piping,chec
kthe
jointsf
orgas
leakagewith
gasleak
detector .
3.Remo
ve
theser
vicepor
tn
ut,and
connectthe
gaugemanif
oldand
thev
acuumpump
tothe
service
port
by
thecharge
hose.
4.V
acuumthe
indoorunit
andthe
connectingpipes
untilthe
pressurein
themlo
wers
tobelo
w-
76cmHg.
5.Remo
ve
thev
alve
stemn
uts,
andfully
openthe
stemsof
the2-w
ay
and3-w
ay
valv
eswith
a
hexagon
wrench.
6.T
ightenthe
valv
estem
nuts
ofthe
2-wa
yv
alve
and3-w
ay
valv
e.
7.Disconnect
thecharge
hoseand
fitthe
nut
tothe
service
port.
(Tightening
torque:1.8kg.m)
Summary of Contents for JBNQ18GB2A1
Page 8: ...Cooling Mode 8 ...
Page 9: ...Auto Operation Mode 9 ...
Page 10: ...Dehumidification Mode 10 ...
Page 12: ...Temperature Setting Room Temperature Checking 12 ...
Page 13: ...Timer 13 ...
Page 17: ...Self diagnosis Function 17 ...
Page 20: ...Wide LCD Wired Remote Controller Optional 20 ...
Page 21: ......
Page 22: ...27 Installer Setting Setting Address of Central Control ...
Page 24: ...Installer Setting How to enter installer setting mode 25 ...